0154Eells, Howard (BMI)
(To access this collection, contact Special Collections or use this feedback form.)
Album 1
0001 Air view southeast, of entire project from Royson, Union Pacific Railroad Junction (12-8-41)
0002 Air view, northeast, of working area in relation to construction boarding camp (center right) (12-8-41)
0003 Air view, east, showing unfinished brick storage (right), brick grinding (center) and finished brick storage (left). (12-8-41)
0004 Air view, east, showing general progress cell buildings, electrolysis units, rail spurs, and brick finishing buildings. (12-8-41)
0005 Air view, northeast, showing construction progress of rail spurs #10, 11A, 12, 13 & 14. (12-8-41)
0006 Air view, southeast, of final machine excavation for electrolysis unit #9. (12-8-41)
0007 Air view, east, of electrolysis unit view #1, showing concrete footings and piers. (12-8-41)
0008 Air view, east, of cell building #1, showing hand excavation nearing completion , ready for footing forms. (12-8-41)
0009 Air view, northeast, of construction boarding camp, showing first stages of construction. (12-8-41)
0010 Air view, southeast, showing relation of construction boarding camp (left) and work area (right) to Las Vegas-Boulder City Highway. (12-8-41)
0011 Pouring concrete footings of electrolysis building unit #3. (12-8-41)
0012 Construction progress of spur track #13 (left) and #11-A (center). Unfinished brick storage building under construction at center left. (12-8-41)
0013 Showing (center left ) a portion of the transportation equipment recently received from San Diego. (12-2-41)
0014 Air view, east, of present construction activities. (12-1-41)
0015 Air view, east, of present construction activities. (12-1-41)
0016 Air view, east, of temporary brick storage, grinding, and finishing buildings. Spur tracks #11-A, and #12 at right. (12-1-41)
0017 Air view, east, showing stages of construction of electrolysis units (left), concrete batch plant (lower center), and temporary construction area (upper right) (12-1-41)
0018 Air view, southeast, with electrolysis units #6-8 in foreground and construction buildings in center. (12-1-41)
0019 Air view, northwest, showing temporary construction area; administration building, parking grounds, warehouses, etc. (12-1-41)
0020 Air view, west, overlooking temporary construction area (center to left), and electrolysis units (upper right). (12-1-41)
0021 Final stages of machine excavation on electrolysis building unit No.7 (11-25-41)
0022 Final stages of machine excavation on electrolysis building unit No.7 (11-25-41)
0023 Completed bed of rail spur showing laying of ties.
0154 HOWARD EELLS (BMI) COLLECTION
Album 1 (cont.)
0024 Completed road bed of rail spur showing laying of ties.
0025 Site of finished brick storage building adjoining brick grinding building. (11-25-41)
0026 Site of finished brick storage building adjoining brick grinding building. (11-25-41)
0027 First stages of construction on finished brick storage building. (11-25-41)
0028 First stages construction on finished brick storage building. (11-25-41)
0029 Tank truck supplying water to concrete mixer for pouring of brick grinding floor. (11-25-41)
0030 Tank truck supplying water to concrete mixer for pouring of brick grinding floor. (11-25-41)
0031 Pouring and finishing concrete for floor of brick grinding building. (11-25-41)
0032 Pouring and finishing concrete for floor of brick grinding building. (11-25-41)
0033 Pouring and finishing concrete for floor of brick grinding building. (11-25-41)
0034 Pouring concrete floor construction of brick grinding building. . (11-25-41)
0035 Showing track laying on plant spur. (11-21-41)
0036 Track laying on plant spur, showing handling of rails. (11-21-41)
0037 Showing plant spur at junction of Union Pacific Railroad. (11-21-41)
0038 Showing plant spur at junction of Union Pacific Railroad. (11-21-41)
0039 Showing track laying on plant spur. (11-21-41)
0040 Track laying on plant spur, showing handling of rails. (11-21-41)
0041 Excavation for Track No. 10 of spur railroad near electrolysis unit for No. 1 (11-15-41)
0042 Typical installation of fire control equipment. (11-15-41)
0043 Erection of concrete batch plant. (11-15-41)
0044 Aerial view southeast showing construction progress (11-10-41)
0045 Aerial view east showing construction progress. (11-10-41)
0046 Aerial view west showing rail spur junction and plant property. (11-10-41)
0047 Equipment grading on plant spur line. (11-8-41)
0048 Equipment grading at junction of Union Pacific Railroad and plant spur line. (11-8-41)
0049 Soil load test platforms. (11-8-41)
0050 Construction progress of temporary sheet metal building. (11-7-41)
0051 Excavations for footings-electrolysis building-unit No.2 (11-7-41)
0052 Pouring concrete footings of electrolysis buildings-unit No.1 (11-7-41)
0053 Pouring of first concrete, for footings of electrolysis building. Unit No.1 (11-4-41)
0054 Mixing of first concrete, for footings of electrolysis building, Unit No. 1 (11-4-41)
0055 Excavation, forms, and reinforcing for footings of electrolysis building, Unit No.1 (11-4-41)
0154 HOWARD EELLS (BMI) COLLECTION
Album 1 (cont.)
0056 Construction progress electrolysis Unit No.6 machine excavation of cellar. (11-17-41)
0057 Construction progress electrolysis Unit No. 5 showing start of excavation for footings. (11-7-41)
0058 Construction progress electrolysis Unit No.4 excavating for footings. (11-17-41)
0059 Construction progress electrolysis Unit No.3 showing completed excavations for footings. (11-17-41)
0060 Construction progress electrolysis Unit No.2 installing reinforcing for footings and piers. (11-17-41)
0061 Construction electrolysis Unit No. 1 showing footings & piers in place. (11-17-41)
0062 Equipment excavation of spur railroad.
0063 Aerial view north showing construction on electrolysis building Units No. 1&2 . (11-14-41)
0064 Construction progress on drafting room adjacent to administration building.
0065 Trucks and shovel making site excavation (10-29-41)
0066 Air view northwest showing construction area, flood control dyke, and fence line. (10-29-41)
0067 Air view east showing construction area. (10-29-41)
0068 Air view south showing construction and shop area. (10-29-41)
0069 Air view south administration and shop area with portion of plant at right. (10-29-41)
0070 Tractors, shovel and trucks at work on actual plant site. (10-27-41)
0071 Unloading 2 ½ yard shovel and drag-line at rail spur. (10-27-41)
0072 Showing completion of transformer station. (10-27-41)
0073 Construction progress on temporary general storage shed. (10-27-41)
0074 Construction progress on temporary material storage shed. (10-27-41)
0075 First stages of construction on temporary.
0076 Construction progress on temporary material storage shed. (10-25-41)
0077 Erection of transformer station (10-24-41)
0078 Construction of temporary material storage shed. (10-23-41)
0079 Installation of gas tank near administration building (10-24-41)
0080 Temporary lumber mill in operation (10-23-41)
0081 Showing construction of temporary auto repair shop. (10-23-41)
0082 Showing the first stages of construction on temporary material storage shed. (10-23-41)
0083 Showing water tanks installed near rail spur.(10-10-41)
0084 A 2 ½ yard shovel excavating on plant site. 10-10-41)
0085 Air view showing temporary administration building under construction (10-8-41)
0154 HOWARD EELLS (BMI) COLLECTION
Album 1 (cont.)
0086 Air view showing completed rail spur and water tanks installed. (10-8-41)
0087 East air view of excavation on plant site. (10-8-41)
0088 Construction of temporary administration building (10-3-41)
0089 Construction of railway spur. (9-23-41)
0090 Tractor and carryall working on railway spur. (9-23-41)
0091 Close view of construction of temporary administration building (9-23-41)
0092 Close view of construction of temporary administration building (9-23-41)
0093 Survey crew running levels of railway spur. 9-17-41
0094 Construction of railway spur on property (9-17-41)
0095 Arrival of first carload of lumber on site. (9-17-41)
0096 Construction of temporary field offices (9-17-41)
0097 North air view of plant site (9-16-41)
0098 East air view of plant site (9-16-41)
0099 Tractor and carryall clearing brush on plant site (9-15-41)
0100 Construction of temporary field offices (9-15-41)
0101 Panorama-east view showing first stages of brush clearings (9-15-41)
0102 Panorama-north view showing first stages of brush clearing. (9-15-41)
0103 Panorama-west view showing first stages of brush clearing (9-15-41)
Album 2
0001 Masonry department, interior view of plaster modeling department, showing experimental brick shapes being made. (3-26-42)
0002 Masonry department, interior view of pattern making department. (3-26-42)
0003 Cell unit #4 showing brick laying in exhaust tunnel at chlorination party wall. (3-26-42)
0004 Cell unit #2, showing concrete wall of exhaust tunnel at chlorination party wall. (3-26-42)
0005 Cell unit #1, showing cell cases and structural steel webbing between cell cases first floor level. (3-26-42)
0006 Showing completed erection of structural steel frame of cell renewal building (3-25-42)
0007 Showing prefabrication of slip forms for five 40' diameter raw magnesite silos. (3-25-42)
0008 Cell unit #2, showing eight furnace shells in place and interior plaster coat being applied.
0009 Cell & unit#1, showing installation of steel cell cases and steel framework at southwest quarter of electrolysis building. (3-25-42)
0010 Cell unit#1, erection of chlorination-electrolysis party wall vertical steel. (3-25-42)
0011 Installation of cell cases in electrolysis section of cell unit#1. (3-18-42)
0154 HOWARD EELLS (BMI) COLLECTION
Album2 (cont.)
0012 Cell building#1, showing hydrogen piping and brine headers installation process. (3-18-41)
0013 Crushed magnesite storage silos showing slip form jackets in place ready for concrete. Preparation building in background. (3-18-42)
0014 Showing progress of McNeil Personnel Bldg. At entrance gate #2. (3-16-42)
0015 Construction progress, seventh work day, McNeil Office Construction Bldg. (3-16-42)
0016 Erection of first party-wall steel, electrolysis-chlorination section, of cell unit #1. (3-16-41)
0017 Construction progress, fifth work day, McNeil Office Building (3-14-42)
0018 Pouring concrete roof deck of fire proof vault in McNeil Office Building. (3-14-42)
0019 Construction progress, third work day, McNeil Office Building (3-12-42)
0020 Construction progress, 4th day on BMI Administration Buildings. (3-11-42)
0021 Construction progress, 2nd day, McNeil Office Building. Note BMI Bldg. Upper left.(3-11-42)
0022 Construction progress, third day's work, on BMI Administration Bldgs. (3-10-42)
0023 Construction progress, first day's work on McNeil Office Bldg. (3-10-42)
0024 Construction progress, second day's work, on BMI Administration Bldg. Following clean-up. (3-8-42)
0025 Equipment groundbreaking for McNeil Office Bldg. (3-9-42)
0026 Showing immediate reconstruction of BMI Administration Building following clean-up. (3-8-42)
0027 Temporary administration bldg. After fire, showing desks and cabinets in foreground. (3-7-42)
0028 Removing debris from site of temporary administration bldg. Morning after fire. (3-7-42)
0029 Midnight view showing destruction of temporary adm. Bldg. By fire. (3-6-42)
0030 Basic Magnesium Inc. Gabbs Valley, Nev. (6-1-42)
0031 Air view, northwest, of General Stores Bldg. And Shop Bldgs. Cell units #1 and #2 in background. (2-24-42)
0032 Air view, southwest, showing construction progress of preparation plant and crushed magnesite storage silos. (2-24-42)
0033 Air view, west, of cell unit#1 , showing pouring of concrete floors and installation of chlorinator furnace shells. (2-24-42)
0034 Air view , west, of electrical transmission tunnel and cell unit#1 construction progress. (2-24-42)
0035 Air view, southeast, showing construction of brine tanks. (2-24-42)
0036 Air view, east, of brine tanks, etc. (2-24-42)
0154 HOWARD EELLS (BMI) COLLECTION
Album 2 (cont.)
0037 Air view, south, showing start of second construction boarding camp unit. (2-24-42)
0038 Air view, west, of construction boarding camp, demountable house site, and magnesium plant. (2-24-42)
0039 Air view east, of entire construction area including construction camp, demountable houses, reservoir and plant site. (2-24-42)
0040 Installation of chlorinator furnace shells at cell unit#1.(2-23-42)
0041 Air view, east, showing unloading, stacking , and storage of bailed peat moss. (2-17-42)
0042 Air view southwest, showing construction progress preparation plant at left and crushed magnacite storage silos at right. (2-17-42)
0043 Air view, south, of cell unit#1, showing chlorination cell piers finished and ready for installation of furnace shell. (2-14-42)
0044 Air view, north, showing construction progress cell unit#1 (left) and #2 (right) and transmission tunnel in foreground. (2-17-42)
0045 Air view, south, showing construction progress of cell buildings with #1 cell building in immediate foreground. (2-17-42)
0046 Air view, east, showing construction progress of cell bldgs. #1 (upper) and #2 (lower) (2-17-42)
0047 Air view, northwest, showing construction progress of permanent shops and stores bldgs. ((2-17-42)
0048 Air view, east, of complete cell block with cell#1 in foreground and electrical transmission tunnel at right. (2-17-42)
0049 Air view, west, showing cell block in center with graded area at right for preparation and foundry bldgs. (2-17-42)
0050 Air view, south, of construction boarding camp showing first unit completed and occupied. (2-17-42)
0051 Air view, west, showing completion of temporary administration building addition. (2-17-42)
0052 Air view, southwest, of structural machine shop and small stores bldgs. (2-11-42)
0053 Air view, southwest, with shop buildings in foreground and cell block in background. (2-11-42)
0054 Air view, south, showing first stages of construction on preparation building. (2-11-42)
0055 Air view, south, of cell unit#1, transmission tunnel, and power sub-station construction. (2-11-42)
0056 Air view, south, of cell building #1 showing construction progress.
0057 Air view, east, of cell bldgs. #1 in foreground and cell block in background. (2-11-42)
0058 Air view, west, with cell unit#10 in foreground. (2-11-42)
0154 HOWARD EELLS (BMI) COLLECTION
Album 2 (cont.)
0059 Air view, southeast, of plant site from elevation 4,000 ft. (2-11-42)
0060 Air view, west, of plant site to U.P. Railroad, note construction camp lower left. (2-11-42)
0061 Air view of terminal reservoir showing water east basin and construction in progress in west basin. (3-31-42)
0062 Air view of booster pumping plant showing booster reservoir (center left) and formwork for pump house (center right)
0063 Air view, of permanent intake pumping plant site. Intake structure footings are under construction in trench (center left) (3-31-42)
0064 Air view north, of general stores and shop bldg. Construction progress.
0065 Air view , west, showing cell units #1 and #2 (center) and transmission tunnel (left). (2-3-42)
0066 Air view, west, of cell bldg. #2 (center) and salt brine storage (right). (2-3-42)
0067 Air view, east, showing cell blocks and transmission tunnel (left progress) and graded area for new construction. (2-3-42)
0068 Air view, east, showing progress of rail spur installations. (2-3-42)
0069 Air view, west, showing cell blocks and transmission tunnel (left progress) and graded area for new construction (right) (2-3-42)
0070 Air view, southwest, of cell bldgs.#1 (left) and #2 (right). (2-3-42)
0071 Air view, north, showing stripping of forms from structural machine shop. (2-3-42)
0072 Air view, north, of temp. administration building showing progress of new addition. (2-3-42)
0073 Addition of temporary water reservoirs #5 and #6 for plant supply.
0074 Air view, north, of temporary administration building, showing first work on new addition. (1-26-42)
0075 Air view, north, showing construction progress of structural machine shop. (1-26-42)
0076 Air view of north, of general stores and small stores buildings, cell blocks in background. (1-26-42)
0077 Air view, southeast, of small stores buildings, structural machine shop, and general stores progress. (1-26-42)
0078 Air view, north, of cell building #1 showing laying of reinforcing steel and pouring of concrete. (1-26-42)
0079 Air view, west, showing construction progress of transmission tunnel and cell unit#1. (1-26-42)
0080 Air view, west, of cell blocks, transmission tunnel at left, cell blocks center, preparation plant grading upper right. (1-26-42)
0081 Air view, east, showing active construction zone. Note grading for preparation plant at center left. (1-26-42)
0082 Air view, southeast, showing completed grading for preparation plant. (1-26-42)
0154 HOWARD EELLS COLLECTION
Album 2 (cont.)
0083 Air view, southeast, showing newly installed trestles on track#10 from main U.P. Line. (1-20-42)
0084 Air view, northeast, of cell unites #1, #2, #3, with electrical transmission tunnel at right. (1-26-42)
0085 Air view, north, showing construction progress of cell building #1. (1-20-42)
0086 Air view, northeast, showing cell buildings #2 (left) and #1 (right). (1-20-42)
0087 Air view, north, from structural machine shop (left) and general stores building. (right) overlooking cell buildings #1 and #2 (center left) and cell units #1 and #2(center right) (1-20-42)
0088 Air view, north, of shop buildings (center), brick finishing bldg. (upper left), and cell bldgs. (upper center).(1-20_42)
0089 Air view, west, with cell unit #1 in foreground.
0090 Air view, east, showing (left) excavation for preparation plant, (center) cell buildings & cell units, (right) brick finishing bldgs and shop buildings.
0091 Air view, east, of entire plant site, showing rail system. (1-20-42)
0092 Air view, altitude 500 feet, of construction boarding camp sewage disposal plant. (1-13-42)
0093 Air view, northwest, showing construction of structural machine shop. ( 1-13-42)
0094 Air view, southeast, of cell units #1 (right) #2 and # 3 (left). . ( 1-13-42)
0095 Air view, southwest, of (left) cell building #1, (right) cell bldg. #2, and temporary brick finishing bldg. In background.
0096 Air view, west, of temp .administration building (center) and restaurant (lower center?)
0097 Air view, east, showing condition of present rail system from track #5 (extreme
left) to rack #14 (extreme rt.) 91-13-42) 0098 Air view, southeast, of demountable city with prefabricating yards at right adjoining UPRR, and water reservoirs (upper right). (5-19-42)
0099 Northeast view of cell building #1, showing reinforcing and forms. (1-9-42)
0100 Construction progress of electrical transmission tunnel at cell unit#1, northwest view showing floor reinforcing. (1-9-42)
0101 Construction progress of electrical transmission tunnel at cell unit #1, east view. (1-9-42)
0102 View through roof section of electrolysis building #1, looking toward chlorinator #1. Cell units #2 and #3 at right. (1-13-42)
0103 Construction boarding camp, view of completed tents. (1-9-42)
0104 Air view, west, of entire plant site, with construction of shop and stores buildings. 91-5-42)
0105 Air view , west, of entire plant site , with construction boarding camp in foreground and plant in background. (1-5-42)
0106 Air view, northwest, showing (center) construction of shop and stores buildings. (1-5-42)
0154 HOWARD EELLS COLLECTION
Album 2 (cont.)
0107 Air view, east, showing construction progress in present work area. (1-5-42)
0108 Air view, north, of #1 cell unit construction progress. (1-5-42)
0109 Air view, southwest, of temporary construction buildings, restaurant, offices, and warehouses. (1-5-42)
0110 Air view, east, showing present construction condition of cell units #1 (right) to #10 (left) (1-5-42)
0111 Air view, west, showing present state of construction of cell units #10 (lower center) to #1 (upper center) (1-5-42)
0112 Electrical distribution tunnel, showing first stages of floor construction, following machine excavation. (1-2-42)
0113 Erection of exterior wall forms of structural machine shop. (1-2-42)
0114 General stores building, looking north, showing excavation completed and footings in place.
0115 Structural machine shop, west view, construction progress.(12-31-42)
0116 Structural machine shop, showing of erection of side wall forms. (12-31-42)
0117 New concrete batch plant nearing completion. (12-31-42)
0118 Air view, northwest view, showing work progress of construction boarding camp. (12-30-41)
0119 Aerial view of project, southeast view, from altitude 2500 feet. (12-30-41)
0120 Unloading reinforcing steel by crane and stacking in stock piles. (12-29-41)
0121 First stages of construction of temporary 2000 KVA transformer sub-station at brick grinding building. (12-29-41)
0122 Cell unit#1 showing (left) pouring and stripping of chlorination cell bases, (right) walls and piers of electrolysis section (12-29-41)
0123 Brick grinding department, showing the first double spindle dry grinder.(12-29-41)
0124 Cell building #2, north view, showing concrete pouring of footings (12-22-41)
0125 Northwest view of cell building #1 showing reinforcement of piers. (12-22-41)
0126 Northeast view of cell building #1 showing pier reinforcing (12-22-41)
0127 Electrical shop ground layout, northeast view showing tracks #12 & 13 and cell blocks in background. (12-22-41)
0128 Machine shop construction progress, northeast view from track #14 to brick storage and grinding building in background. (12-22-41)
0129 General stores warehouse construction progress looking east from track #14.(12-22-41)
0130 Electrolysis unit#9, looking northeast, showing pouring of footings and piers.(12-19-41)
0131 Northwest view showing construction activity in electrolysis units. (12-19-41)
0132 Construction boarding camp, looking north from dormitory sub-floors construction. (12-19-41)
0133 Construction boarding camp, northeast view of tent area. (12-19-41)
0134 Erection of forms for chlorinator building of electrolysis unit #1 (12-17-41)
0154 HOWARD EELLS (BMI) COLLECTION
Album 2 (cont.)
0135 Machine excavation for electrical distribution tunnel, between track #10 and electrolysis unit#2. (12-17-41)
0136 Machine excavation for electrical distribution tunnel, electrolysis unit #1 in background. (12-17-41)
0137 Electrolysis unit #6, pouring concrete into pier forms by crane from transit mix truck. (12-16-41)
0138 Construction of electrolysis unit#1 remaining footings, and excavation for footings of rectifier building (12-16-41)
0139 Construction boarding camp, erection of commissary (12-16-41)
0140 Construction boarding camp, work progress in tent area (12-16-41)
0141 Construction progress of Anderson restaurant, west view (12-15-41)
0142 General view of construction progress of electrolysis unit #9 (12-13-41)
0143 Electrolysis unit #9, showing installation of reinforcing steel in footings and piers. (12-13-41)
Album 3
0001 East view from prep building showing pellet storage building, magnesium oxide silos, neutralizing tanks, and metal producing plant at right. (6-24-42)
0002 Preparation building, showing installation of #4 rotary kiln and brick tunnels #5 and #6 under construction. (6-24-42)
0003 Preparation area, showing pellet storage building in foreground, rotary kiln and tunnel kiln portions of prep. Building and magnesium chloride tanks at left. (6-24-42)
0004 West view from top of preparation building , showing prep office , salt storage, crusher and dryer building and primary peat storage buildings. #1 and #2 (6-24-42)
0005 Cell building #2, showing structural steel roof members installed ready for application of A.P.M. roofing. (6-24-42)
0006 Showing tractor loading salt on track-grizzly, and portion of conveyor to brine tanks. (6-24-42)
0007 South view of cell unit#1, showing completed exterior of chlorinator building and construction progress of recovery buildings 1-A and 1-B (6-24-42)
0008 Southeast view of cell units #7,8,9 &10, showing furnace shell installation complete and progress of steel erection. (6-18-42)
0009 Preparation area, east view, showing construction progress of salt storage and handling building. Preparation building in background. (6-18-42)
0010 Southeast view of preparation area, showing from left to right, pulverizer building salt and coal bins, raw magnesite silos, shredded peat storage building site under construction, and sub station #5.
0154 HOWARD EELLS (BMI) COLLECTION
Album 3 (cont.)
0011 South view of cell unit #1, showing completed installation of A.P.M siding and roofing and construction progress of recovery buildings 1-A and 1-B.
0012 Showing progressive stages of construction on four thickener tanks in neutralizing plant (6-18-42)
0013 Showing completed concrete pouring of two magnesium oxide silos, with neutralizing clarifloculators and thickening tanks at right. (6-18-42)
0014 North view of salt storage and handling building, showing erection of roof trusses. Peat drying area in background. (6-18-42)
0015 Preparation are, showing completion of roof sheathing on primary peat storage building#1, and first stages of roof truss erection on building #2 at left. (6-18-42)
0016 West view of preparation area, showing pellet storage and handling building in fore ground, rotary kiln and tunnel kiln portion of preparation building (center) (6-18-42)
0017 Showing completed excavation and footings on hospital building, and erection of concrete tile walls in progress.
0018 Northwest view of preparation building, showing progress of steel erection of tunnel kiln and rotary kiln section (6-11-42)
0019 Construction progress at primary peat storage building #1, showing walls nearing completion (6-11-42)
0020 South view of cell unit#1, showing A.P.M. siding and roofing nearing completion and first stages of construction on recovery buildings 1-A and 1-B. (6-11-42)
0021 West end of kiln tunnel in preparation building B-2, showing masonry progress. (6-8-42)
0022 Interior view of cell renewal building showing completed installation of vacuum pumps, catch all, vacuum tanks, and process piping reading for operation.(6-8-42)
0023 Interior basement view of cell unit #1, showing chlorine piping at right, parallel to electrolysis cells, and at left, chlorine pipe to filters and blowers. (6-8-42)
0024 Interior view of liquefaction building mezzanine floor, showing completed cooling tower installation. (6-8-42)
0025 Interior view of cell building #2, showing hooker cells in place and cell liquor-brine-hydrogen-chlorine piping. (6-8-42)
0026 East side of cell building #2, showing hydrogen-brine and cell liquor piping.
0027 West side of cell building #2, showing hydrogen-brine and cell liquor piping and erection of structural steel. (6-8-42)
0028 Cell unit#6 showing electrolysis portion (left) and erection of party wall steel of chlorinator building at right.
0029 Chlorinator portion of cell unit #5, showing erection of steel and installation of wash towers.
0030 South view of cell unit#2, showing progress of steel erection and installation of wash towers.
0154 HOWARD EELLS (BMI) COLLECTION
Album 3 (cont.)
0031 Northeast view of cell unit#1, showing building (left), electrolysis building (center) and chlorinator building far right.
0032 Southwest view of chlorinator building #1, showing construction progress and installation of A.P.M. roofing (6-4-42)
0033 Installation of conveyor system to raw brine storage tanks
0034 Construction progress of salt storage and handling building, showing erection of structural steel on concrete park (6-4-42)
0035 Showing erection of wood roof trusses on primary peat storage buildings #1.
0036 Construction progress of thickener tanks in neutralizing plant, showing wall forms and reinforcing steel in place. (6-4-42)
0037 Northwest view of preparation building, showing steel erection of tunnel kiln and rotary kiln sections. Note completed magnesium tanks at left. (6-4-42)
0038 Interior view, cell building#1, showing installation of hooker type "S" chlorine cells. (5-29-42)
0039 Cell renewal building, showing cell plates being removed from lead moulder. (5-29-42)
0040 Interior view of cell renewal building showing cell plates in chlorine cell ready for lead pouring (5-29-42)
0041 Interior first floor view of chlorinator unit#1 , showing masonry progress at base of chlorinator furnace shells. (5-29-42)
0042 Showing installation of rectifier units in cell building #1. (5-29-42)
0043 Construction progress of preparation plant salt storage and handling building. Note peat storage and drying beds in background. (5-27-42)
0044 Southeast view of cell units, showing construction progress of units #5, 6,7,8. (5-27-42)
0045 Northeast view of preparation plant, showing steel erection on rotary kiln and tunnel kiln buildings (5-27-42)
0046 Northwest view of primary peat storage buildings #1 and#2 , showing erection of roof members. (5-27-42)
0047 Southeast view of cell building #1, showing transformer installation. (5-27-42)
0048 Air view, southeast, of trailer and construction boarding camps. Note installation of utilities in trailer camp area. (5-19-42)
0049 Air view, south, showing temporary administration and construction buildings, with demountable city in background. (5-19-42)
0050 Air view, east, of preparation area, showing primary peat storage buildings, storage silos, coal storage, salt storage, and preparation buildings. (5-19-42)
0051 Air view, southwest, showing entire preparation area with cell units and chlorine buildings in background. (5-19-42)
0052 Air view, northeast, of chlorine building and liquefaction building #1.
0154 HOWARD EELLS (BMI) COLLECTION
Album 3 (cont.)
0053 Air view, south, of chlorine producing area, #1 at left, and #2 at right. Note brine tanks, concrete parts building, cell renewal building and liquefaction building #1. (5-19-42)
0054 Air view, east, of metal producing plant, altitude 2,000 feet. Background shows construction boarding camp and demountable townsite. (5-19-42)
0055 Air view, west, showing construction progress of cell units Nos. 4,3,2, &1. (5-19-42)
0056 Vacated.
0057 Air view, east, of metal producing plant, altitude 2,000ft. Background shows construction boarding camp and demountable town site. (5-19-42)
0058 Erecting vertical steel party walls and placing cell tank supporting members at cell unit #5. (5-13-42)
0059 Showing installation of overhead cranes in chlorinator buildings. #1 (right) and #2 (left). (5-13-42)
0060 Installation of A.P.M roofing on electrolysis bldg.#1 . Chlorinator structure in background. (5-13-42)
0061 Vacated
0062 Interior view of electrolysis building #1, showing masonry dep't. Lining cell tanks with brick. (5-13-42)
0063 East view of preparation plant, showing construction progress. Note wind and dust storm. (5-13-42)
0064 Construction progress of salt storage and handling buildings. Coal storage and peat drying beds in background. (5-13-42)
0065 North west view of preparation area, showing primary peat storage bldgs. Substation #5 , salt and coal bins.
0066 Erection of liquefaction building#1 structural steel. (5-13-42)
0067 Cell building #1, showing construction progress and installation of A.P.M siding and roofing. (5-13-42)
0068 Copper buss bar bending machine in operation (5-7-42)
0069 Showing completed shapes removed from copper buss bar bending machine. (5-7-42)
0070 Air view, NE, of sewage disposal plant. Detention lagoons (left), clarifiers and bio filters (center) and imhoff tanks (upper right) (5-6-42)
0071 Air view, southwest, of construction boarding camp, showing progress of third unit. (5-6-42)
0072 Air view, east, of temporary structures. Restaurants, BMI hdqrts. Storage warehouse, gen. Stores , elect. Plumbing , McNeil hdqrts. (center right) (5-6-42)
0073 Air view, NE, showing permanent warehouse bldgs. Inflammable liquid stores, small stores, misc. shops, elect. Shop, structural and machine shop, gen. Stores, temp. buss bar bldg. At right (5-6-42)
0154 HOWARD EELLS (BMI) COLLECTION
Album 3 (cont.)
0074 Air view, east, cell units #1 to #7, showing construction progress of chlorination, electrolysis, and rectifier bldgs. Note power sub-stations at right. (5-6-42)
0075 Air view, north, chlorine area. Salt and brine system, #1 & #2 cell bldgs. Cell renewal bldg. And #1 & #2 liquefaction bldgs. (5-6-42)
0076 Air view, NE, preparation area. Primary peat storage , coal storage, salt storage, raw magnesite storage, and preparation buildings. (5-6-42)
0077 Air view, east, showing construction progress of entire metal producing plant.
(5-6-42)
0078 Air view, southwest, showing unit 3 of construction boarding camp under construction. Demountable site at left, and metal plant at right. (4-3-42)
0079 Air view, east, of preparation area, showing silos, rotary kiln and tunnel kiln bldgs. Magnesite silos, and peat storage bldgs. (4-30-42)
0080 Air view, northwest, of preparation plant, showing rotary kiln and tunnel kiln bldgs. Magnesite silos, and peat storage bldgs. (4-30-42)
0081 Air view, east, of cell block, looking from cell unit #1 to #10 (4-30-42)
0082 Air view, north, of chlorine plant, unit #2 (left), unit #1 (right), and supporting buildings under construction (4-30-42)
0083 Air view, west, showing construction progress of cell units. Looking from unit#8 to #1. (4-30-42)
0084 Air view, southeast, showing entire plant site, trailer camp site , boarding camp, demountable houses, and reservoir. (4-30-42)
0085 Air view, north, showing condition of ten producing plants and preparation area. (4-30-42)
0086 Air view, northwest, showing entire project, demountable houses, construction boarding camp, and metal producing plant. (4-30-42)
0087 Air view, northwest, of demountable house site, showing occupied houses at right and those under construction at left. (4-30-42)
0088 Cell unit #2 showing construction progress of electrolysis and chlorinator sections (4-20-42)
0089 Cell unit#1, interior view, showing cell tanks in place and progress of concrete floor finishing. (4-20-42)
0090 Cell unit #1 overlooking steel roof members of electrolysis section to steel framework of chlorinator building (4-20-42)
0091 Cell unit #1, showing erection progress of chlorinator building, electrolysis section, and rectifier bldg. (4-20-42)
0092 Cell unit #4, showing chlorinator furnace shells in place and masonry crews at work. (4-20-42)
0093 East view, showing construction (right) (4-20-42)
0094 Erection progress of structural steel roof members of cell bldg#1. (4-20-42)
0095 Magnesium chloride tanks (left center), rotary kiln portion of preparation (center), and tunnel kiln portion under construction (right). (4-20-42)
0096 Construction progress of magnesite storage silos, showing slip forms in operation. (4-20-42)
0097 Cell renewal building nearing exterior completion with brine storage tanks center left. (4-20-42)
0098 Completed application of APM siding on cell renewal bldg. Note brine storage tanks at left. (4-15-42)
0099 Assembly and erection of magnesium chloride storage tanks south of preparation building (4-15-42)
0100 Three 40'X86' magnesite storage silos with truck in receiving pit under construction. (4-15-42)
0101 Foundations and wall forms of salt storage building (4-15-42)
0102 Construction of wall forms of salt storage building (4-15-42)
0103 Stripping concrete wall form to pre-heater level of rotary kiln portion of preparation building (4-15-42)
0104 Vertical structural steel members in place, east half of cell bldg. #1 (4-15-42)
0105 Showing wall forms above operating floor level, chlorine cell rectifier building #1 (4-15-42)
0106 Assembly of structural steel and rigging with P&H crane in place, chlorinator bldg#1 (4-15-42)
0107 Three 20'X50' coal and salt storage silos, wall forms poured (4-11-42)
0108 Brine storage tanks; showing completed raw brine tanks, first segment of 3 sludge tanks, and first segment of clarifloculator tank. (4-8-42)
0109 Installation of APM roofing on cell renewal building (4-8-42)
0110 Cell unit #1; showing structural steel webbing of electrolysis floor and installation of last cell cases. (4-8-42)
0111 Chlorine cell bldgs.#1 erection of vertical steel members, brine, hydrogen, and chlorine piping (4-7-42)
0112 Air view, east , of trailer camp site, and construction boarding camp. (4-7-42)
0113 Air view, south, of demountable house construction progress.
0114 Air view, northwest, of magnesium plant, looking towards Royson Junction. (4-7-42)
0115 Air view, southeast, of entire plant site. Looking from Royson Junction to demountable house site. (4-7-42)
0116 Air view, northwest, of entire plant site with Las Vegas in background (4-7-42)
0117 Showing reinforcing steel and electrical conduit in ground floor slab of #2 rectifier building (4-2-42)
0118 Cell #1, showing installation of wash towers and erection of chlorination building steel frame work.
0119 Cell unit #1 showing installation of cell cases and erection of steel roof members. (4-1-42)
0120 Air view, northeast, showing construction progress of cell unit #1. (3-31-42)
0121 Air view, east, showing construction of raw magnesite storage silos and preparation building (3-31-42)
0122 Air view, northwest of construction boarding camp showing second unit nearing completion and ground clearing for trailer camp. (3-31-42)
0154 HOWARD EELLS (BMI) COLLECTION
Album 3 (cont.)
0123 Air view northwest of entire project. Reservoir (lower left), demountable house site (center right), plant site (upper right) (3-31-42)
0124 Air view east of plant site, showing demountable houses (upper right) and construction boarding camp (upper center) (3-31-42)
0125 Air view, northwest, showing construction progress of demountable houses (3-31-42)
0126 West basin of the Terminal Reservoir showing gunite operations in progress. (3-30-42)
0127 Cell unit#1 showing installation and painting of cell cases and steel structure. (3-28-42)
0128 Electrical conduit and reinforcing steel installation on ground floor deck of rectifier section of cell building #1 (3-28-42)
Album 4 (Housed with photograph collection)
0001 Air view, southwest, showing present construction condition of sewage disposal plant. Note cell units (upper right). (9-23-42)
0002 Air view, west, showing grading of grounds for landscaping at hospital. (9-23-42)
0003 Air view, northwest, chlorine area, showing cell bldgs. 1 and 2, liquefaction bldgs. 1and 2, cell renewal and concrete parts buildings, and brine system. (9-23-42)
0004 Air view, south, of preparation area, showing preparation buildings B-1 and B-2
and supporting structures. Cell units 1,2,3 (upper center) (9-23-42)
0005 Air view, northwest, neutralization area, showing installation of equipment in thickener tanks and steel erection of neutralization building. (9-23-42)
0006 Air view, west, showing washery sections and ingot casting portions of refinery bldgs J-1 and J-2. Note main water cooling tower, upper center. (9-23-42)
0007 Air view, west, showing construction progress on metal producing portion of plant. (9-23-42)
0008 Air view, west, showing completed exterior of Basic Townsite school. (9-23-42)
0009 Air view, southwest, women's apartments, showing erection of studs and general layout (9-23-42)
0010 Northwest view, preparation Bldgs. B-1 and B-2, showing installation of APM siding. (9-17-42)
0011 South view, showing bases for 40,000 gallon acid storage tanks, erection of steel for neutralization bldg. And magnesite silos.
0012 Showing installation of agitator mechanism in clarifloculator #2 in neutralization area. Neutralization bldg structural steel foreground. (9-17-42)
0013 West view, recovery bldgs. 1-A, B, showing installation of clarifier tank (1-A) and tank footings (1-B). (9-17-42)
0014 Construction progress of women's dormitory, showing erection of side walls and installation of plumbing. (9-17-42)
0015 Construction progress of elementary school and auditorium in Basic Town site. (9-17-42)
0016 Northeast view, preparation Bldg B-2, showing erection of transfer conveyor and head house and temporary system now in use. (9-16-42)
0017 Looking north to cell units #9 and #10, and showing installation of 54" storm drain down 15th Street. (9-16-42)
0018 East view, pellet storage bldg showing stripping of side wall forms. (9-16-42)
0019 North view, foundry bldgs J-1 and J-2, showing construction of wall forms, and backfill completed in washery sections. (9-16-42)
0020 Air view, northwest, chlorine area, showing cell bldgs #1 and #2, liqufaction and cell renewal bldgs, brine system and boiler house. (9-8-42)
0021 Air view, northwest, preparation area, showing pellet storage bldg, prep. Bldgs B-1 and B-2, magnesium chloride tanks, salt, coal, peat, and magnesite bldgs.
0022 Air view, north, neutralization area, showing thickeners, clarifloculators, magnesite silos. Main water cooling tower (right background). (9-8-42)
0023 Air view, north, overlooking cell units #7 and #8, showing construction boarding camp in background. (9-8-42)
0024 Air view, east, metal producing plant, with trailer camp and construction boarding camp in background. (9-8-42)
0025 Air view, east, metal producing plant, with trailer camp and construction boarding camp in background (9-8-42)
0026 Air view, northwest, of entire project, reservoirs, demountable townsite, metal plant construction camp and trailer camp. (9-8-42)
0027 Air view, south, demountable house townsite, showing initial stages of construction on women's dormitory. (9-8-42)
0028 Air view, northeast, demountable house townsite, showing school building nearing completion. (9-8-42)
0029 Air view, north, of entire demountable house townsite. (9-8-42)
0030 Foundation wall between washery and ingot casting section of foundry bldg. J-1. (9-4-42)
0031 Installation of boilers and construction progress of boiler house (9-4-42)
0032 Construction of transfer conveyor and head house from mixer to B-2 preparation bldg. Note bins on temporary by-pass.
0033 Air view, northeast, showing trade effluent launder and effluent disposal ponds. (8-27-42)
0034 Air view, northeast showing construction progress of hospital and staff building. (8-27-42)
0035 Air view, northwest, of entire brine system, also chlorine bldg #2 , caustic tanks and boiler house. (8-27-42)
0036 Air view, west of preparation area, showing pellet storage bldg. Preparation bldgs B-1 &B-2, peat, coal salt, magnesite and fuel oil structures (8-27-42)
0037 Air view, west, of foundry buildings, neutralization area, and preparation area. (8-27-42)
0038 Air view west. (8-27-42)
0039 Air view, west, looking toward Royson Junction, cell unit #10 and administration buildings in foreground (8-27-42)
0040 Air view, east, plantsite from Royson Junction, to construction boarding camp. (8-27-42)
0041 Air view, north, of Basic Townsite school, showing construction progress. (8-27-42)
0042 Air view, northwest, of Basic Townsite, reservoirs, magnesium plant, and camp. (8-27-42)
0043 Northwest view from chlorinator #1, showing recovery bldgs. (A) and (B), with clarifiers under construction (8-19-42)
0044 Northeast view from chlornator #1, showing recovery bldg-B in foreground, and preparation bldgs in background. (8-19-42)
0045 West view, preparation area, showing calcined magnesite truck-unloading station, pellet storage bldg, and preparation bldg. B-1, B-2. (8-19-42)
0046 North view, showing construction of trade effluent launder feed line. (8-19-42)
0047 Northwest view, showing main water cooling tower under construction (8-19-42)
0048 Interior of preparation bldg. B-1, showing rotary kiln #4 at junction flue from preheater to kiln (8-18-42)
0049 Masticator , extruder, and breaker conveyors in prep building B-2, and rotary kilns 4,3,2, &1 in preparation bldg B-1 (8-18-42)
0050 Interior view, preparation bldg, showing tunnel kilns #1 to #6, and rotary kiln #4. (8-18-42)
0051 Showing reinforcing and forms for footings and piers of ingot casting section of foundry bldg. (8-18-42)
0052 Northwest portion of main water cooling tower, showing assembly of pre-fabricated sections. (8-17-42)
0053 Air view, southwest, showing basic trailer camp in foreground adjacent to boarding camp at left, with metal plant in background. (8-11-42)
0054 Air view, west, showing access roads through shops and stores area, with chlorine group and cell units 1,2,3, at right. (9-23-42)
0055 Air view, southwest, of construction boarding camp, showing dormitories, tents, and commissary. (8-11-42)
0056 Air view, north, showing hospital and staff quarters nearing completion. (8-11-42)
0057 Air view, west, of chlorine area, showing completed cell bldg#1 liquefaction and cell renewal bldg with #2 chlorine and liquefaction bldgs under construction. (8-11-42)
0058 Air view, northwest, showing cell units #1 to #5, chlorine area at left and preparation area at right. (8-11-42)
0059 Air view, east, of preparation area, showing peat storage bldg salt , coal, and magnesite silos, preparation and pellet storage bldg. (8-11-42)
0060 Air view, northwest, cell unit #4 in foreground, and preparation area in background. (8-11-42)
0061 Air view, west, of neutralization and preparation areas. (8-11-42)
0062 Air view, southwest, showing construction progress of ingot foundries #1 (8-11-42)
0063 Air view, southwest, showing sewage disposal plant. (8-11-42)
0064 Looking east from neutralization thickeners, showing construction progress of foundry buildings. (8-5-42)
0065 Showing installation of rotary kiln at junction of hood from kiln to cooler (8-5-42)
0066 Preparation bldg. Showing sheet metal installation on twin tunnels #5 and#6 at left, and rotary kiln and cooler installation at right. (8-5-42)
0067 Preparation area, looking west, showing construction progress of pellet storage bldg, and B-1 and B-2 sections of preparation bldg (8-5-42)
0068 Southeast view, prep area, salt drying bldg (left), coal and salt bins (right), pulverizing bldg (center) , raw magnesite silos and preparation bldg. (8-5-42)
0069 Northeast view from cell unit #1, showing installation of cell hoods. (8-5-42)
0070 Interior view, electrolysis building #1, showing installation of cell hoods. (8-4-42)
0071 Brick lining flue chambers from combustion chamber (8-4-42)
0072 Interior view, preparation building B-1 , showing masonry and machinery installations on pre-heaters. (8-4-42)
0073 Interior view, showing masonry installation in salt furnace dryer. (8-4-42)
0074 Air view, west, showing construction progress of hospital building. Note application of shingles. (7-28-42)
0075 Air view, west, construction of boarding camp, units #1, and 2 and 3 complete and #4 under construction. Trailer camp (right), magnesium plant (upper right). (7-28-42)
0076 Air view, north, showing raw magnesite silos (left), preparation Bldgs.B-1 and B-2 (center) and pellet storage bldg (right) (7-28-42)
0077 Air view west, showing neutralization thickeners and clarifloculators, magnesium oxide silos, pellet storage bldg, and preparation bldg. (7-28-42)
0078 Air view, northeast, showing cell units #1 and #2 (center), peat storage bldgs (left) and preparation area. (7-28-42)
0079 Air view, west, of chlorine area, showing cell bldgs #1 and #2 liquefaction and cell renewal bldgs, and brine system. (7-28-42)
0080 Air view, northwest, showing terminal reservoirs, Basic Townsite, and magnesium plant. (7-28-42)
0081 Air view, south, of plant site, showing effluent disposal ponds in foreground, caustic evaporation ponds, metal producing area, and Basic Townsite (7-28-42)
0082 Air view, west, showing cell units #10 to #1, foundry, neutralization, preparation and chlorine areas. Peat storage and drying beds at right. (7-28-42)
0083 Air view, northeast, showing peat storage, preparation, and chlorine area, and cell units #1 to #10; construction trailer and boarding camps (upper right). (7-28-42)
0084 Hospital building, showing general construction progress and laying of roofing. (7-23-42)
0085 View of primary construction in foundry area, thickener tanks of neutralization area in foreground. (7-23-42)
0086 East view, preparation area, salt crusher and dryer, salt& coal bins, pulverizer bldg, magnesite silos, and preparation bldg B-2 (7-23-42)
0087 View of primary peat storage bldgs #1 and #2, showing installation of 8" airveyors to secondary peat storage bldg. (7-23-42)
0088 Northeast view of preparation area, showing secondary peat storage bldg. Mangnesite silos, and B-1 portion of preparation building (7-23-42)
0089 Showing sheet metal piping from auxiliary furnace being installed over tunnel kiln, preparation bldg section B-2 (7-23-42)
0090 West view of preparation plant, pellet storage bldg in foreground, magnesium chloride tanks, rotary kiln and tunnel kiln sections of preparation bldg. (7-23-42)
0091 North view from chlorinator bldg, of cell unit #1, showing progress of clarifiers and recovery bldg. (7-23-42)
0092 Southwest view, chlorinator section of cell unit #1, showing construction progress of recovery bldgs #1 and #2. (7-23-42)
0093 Construction of magnesite conveyor tunnel from unloading station to silos, neutralization and foundry areas in background (7-22-42)
0094 Air view, southwest, of chlorine area, showing cell bldgs #1 and #2, liquefaction, cell renewal, and caustic bldgs, boiler house, and brine system. (7-15-42)
0095 Air view, east, showing progressive construction of cell units #1 to in background. (7-15-42)
0096 Air view, south, showing preparation and neutralization areas, cell units #1 to #10. Basic Townsite in bacground. (7-15-42)
0097 Air view, west, showing preparation area (left), caustic evaporation ponds (center), and effluent disposal ponds at right. (7-15-42)
0098 Air view, west, showing progressive construction of cell units#10 (foreground) to #1. Preparation, neutralization and foundry areas at right. (7-15-42)
0099 Air view, east, showing entire metal producing area from Royson to construction boarding camp. Note Basic Townsite (upper right). (7-15-42)
0100 Air view, east, of hospital and staff bldg. Boulder City-Las Vegas Highway parallel at center, and BMI Highway at right (7-15-42)
0101 Air view, southeast, of preparation area, peat beds in foreground, preparation and neutralization structures, and cell bldgs #1 to #5. (7-15-42)
0102 Air view, west, showing construction boarding camp and Basic Townsite trailer camp (7-15-42)
0103 Air view, north, showing terminal reservoir in foreground, Basic Townsite (center), plant site (center left), and construction boarding camp (extreme right) (7-15-42)
0104 North view from chlorinator bldg of cell unit #1, showing bases for clarifloculator tanks and construction progress of recovery bldg #1.
0105 Northeast view of preparation area, showing secondary peat storage bldg, calcined and raw magnesite storage silos, and portion of preparation plant B-1. (7-9-42)
0106 West view of preparation plant, showing magnesioum chloride tanks, pellet storage building, rotary kiln and tunnel kiln portions of preparation bldg. (7-9-42)
0107 North view of hospital building, showing roof sheathing and general construction progress. (7-9-42)
0108 Southwest view of preparation area, showing pulverizer bldg, salt storage bldg, salt and coal storage bins, and primary peat storage bldg #1 and #2. (7-9-42)
0109 Interior view of preparation bldg, showing tunnel kilns #5 and #6, rotary kiln #4 and cooler #4 installed and placing of rotary kiln #3 (9-8-42)
0110 Southwest view, cell unit#1, showing completed exterior of chlorninator building, and construction progress of recovery units. (7-8-42)
0111 Excavation and footing forms for twelve turbo-neutralizers in neutralizing plant. (7-8-42)
0112 Interior view of anode assembly bldg, showing graphite anode bars being assembled into units following pickling in phosphoric acid (7-8-42)
0113 Interior view of buss bar bldg, showing completed copper shapes ready for installation. (7-8-42)
0114 Air view, northwest, showing construction progress of hospital bldg, and relation of hospital to plant. BMI highway in foreground. (7-2-42)
0115 Air view, south, showin trailer camp, construction boarding camp, Boulder City- Las Vegas Highway, deomountable house area at right (7-2-42)
0116 Air view, west, preparation area, showing neutralizing plant, magnesium oxide silos, pellet storage, and prep. Bldg with peat bldgs in background. (7-2-42)
0117 Air view, east, preparation area, showing primary peat bldgs #1 and #2 shredded peat storage, magnsesite silos and preparation bldg (7-2-42)
0118 Air view, northeast, showing brine tanks, cell bldgs #1 and #2, liquefaction #1 cell renewal bldg, cooling tower, and concrete parts bldg (7-2-42)
0119 Air view , east, of cell block, with unit #1 in foreground, preparation area (left) and power-sub-stations (right) (7-2-42)
0120 Air view, southwest, of plant site, cell unit #10 in foreground, refinery area at right , and preparation, area (upper right) (7-2-42)
0121 Air view, northwest, showing demountable house area (left), metal plant (center), caustic evaporation ponds (center right), and construction camp (lower right). (7-2-42)
0122 Air view, east, of plantsite, showing caustic evaporation ponds (left), metal plant (center), construction camp (upper center), and demountable houses at right. (7-2-42)
0123 Air view, west, of demountable house area. Note completed and occupied groups at right, and houses under construction at left near reservoir. (7-2-42)
0124 Showing construction progress and laying of concrete tile for hospital building (6-24-42)
0125 Close view of distributing conveyor loading salt into raw brine tanks. (6-24-42)
0126 Feed conveyor transporting salt to distributor conveyor into raw brine tanks. (6-24-42)
Album5 (Housed on North Dakota A, Temporary #6)
0001 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0002 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0003 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0004 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0005 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0006 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0007 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0008 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0009 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0010 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0011 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0012 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0013 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0014 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0015 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0016 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0017 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0018 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0019 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0020 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0021 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0022 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0023 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0024 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0025 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0026 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0027 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0028 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0029 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0030 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0031 Oxide plant---Gabbs Valley, Nev. (6-1-42)
0032 Oxide plant---Gabbs Valley, Nev. (12-29-42)
0033 Oxide plant---Gabbs Valley, Nev. (12-29-42)
0034 Oxide plant---Gabbs Valley, Nev. (12-29-42)
0035 Oxide plant---Gabbs Valley, Nev. (11-28-42)
0036 Oxide plant---Gabbs Valley, Nev. (12-29-42)