| Location: |
5255 S. Boulder HIghway Las Vegas, NV 89122 |
|---|---|
| Type(s): | |
| Subtype(s): | |
| Constructed: | 2007-04 |
| Completed: | 2008-08-22 |
| Cost: | $250 M |
| Size (sq. ft.): | 529967 |
| Other Size Measure: | 65,000 Sq.Ft Casino Space 1/2 Acre Pool area 20,000 Sq.Ft. Ballroom/Meeting Space |
| Firm(s): |
|
| Owners: | Cannery Casino Resorts Crown Ltd. 2008 - Present |
| Contractors: | General Contractors: M.J. Dean Construction Interior Designer: Yates Silverman Landscape Architect: JW Zunino & Associates Structural Engineer: Lochsa Engineering |
| Description: | 16 Story 307 Rooms 2000 Slot Machines 26 Table Games |
| Extra Note: | Opened August 28, 2008 (8 p.m.) The 16 story casino has six new restaurants, a concert lounge and a half acre pool area with cabanas. It is on the site of the old Nevada Palace and is the first new major Boulder Highway Casino on the Eastside in a decade. Built on the site of Nevada Palace Casino & Hotel Knightly, Arnold M. "Nevada Palace saying its last goodbyes." Las Vegas Review-Journal. 29 February 2008. [Online]. Available: http://www.lvrj.com/business/16105487.html Accessed October 3, 2008. "Southwest Contractor: 2007 Top Projects Nevada." Southwest Contractor. June 2008: 70. "Topping-Off Celebrated at Eastside Cannery." Nevada News. June 2008: 32. AIA Nevada Design Awards (2009) Entry No. B09015, Submission. |
| Chronologically Direct Parent: | Nevada Palace Casino & Hotel |
| Chronologically Largest Parent: | Nevada Palace Casino & Hotel |