Architecture Studies Library
       University of Nevada, Las Vegas Libraries
UNLV HOME (University of Nevada, Las Vegas)
Links for ASL and Libraries Hours for all UNLV Libraries Search catalog for all UNLV Libraries Access your library account ASL Comment Form
ASL Books     Articles     Course Reserves    
                            
The ASL The Web

UNLV Libraries Main Page -> Architecture Studies Library -> Las Vegas Guides and Collections -> Las Vegas Architects and Buildings Database -> Projects

Eastside Cannery Casino & Hotel

Location:
5255 S. Boulder HIghway
Las Vegas, NV 89122
Type(s):
Subtype(s):
Constructed: 2007-04
Completed: 2008-08-22
Cost: $250 M
Size (sq. ft.): 529967
Other Size Measure: 65,000 Sq.Ft Casino Space
1/2 Acre Pool area
20,000 Sq.Ft. Ballroom/Meeting Space
Firm(s):
Owners: Cannery Casino Resorts
Crown Ltd. 2008 - Present
Contractors: General Contractors: M.J. Dean Construction
Interior Designer: Yates Silverman
Landscape Architect: JW Zunino & Associates
Structural Engineer: Lochsa Engineering
Description: 16 Story
307 Rooms
2000 Slot Machines
26 Table Games
Extra Note: Opened August 28, 2008 (8 p.m.) The 16 story casino has six new restaurants, a concert lounge and a half acre pool area with cabanas. It is on the site of the old Nevada Palace and is the first new major Boulder Highway Casino on the Eastside in a decade.

Built on the site of Nevada Palace Casino & Hotel

Knightly, Arnold M. "Nevada Palace saying its last goodbyes." Las Vegas Review-Journal. 29 February 2008. [Online]. Available: http://www.lvrj.com/business/16105487.html Accessed October 3, 2008.

"Southwest Contractor: 2007 Top Projects Nevada." Southwest Contractor. June 2008: 70.

"Topping-Off Celebrated at Eastside Cannery." Nevada News. June 2008: 32.
AIA Nevada Design Awards (2009) Entry No. B09015, Submission.
Chronologically Direct Parent: Nevada Palace Casino & Hotel
Chronologically Largest Parent: Nevada Palace Casino & Hotel