| Photos & Links: | (Web Page 1) |
|---|---|
| Location: |
Water St. Henderson, NV |
| Alternate Name(s): |
|
| Type(s): | |
| Subtype(s): | |
| Completed: | 2006-09 |
| Cost: | $8 M |
| Size (sq. ft.): | 140000 |
| Firm(s): |
|
| Architect(s): | |
| Contractors: | Landscape architect: SPLA Structural engineer: Locsha Engineering Electrical engineer: TJK Consultant Eng. Civil engineer: TRC-BV Engineering General contractor: Blanchard & Hoffman Design architects: Graham Downes Architecture |
| Description: | The plaza is the focus of the Water Street Redevelopment District and promotes events thorough out the year. It is structured to cater to a variety of activities and features such amenities as a shaded amphitheater with lawn and stage facilities, shaded walk-ways between public facilities, large courtyards for major venues; a water entertainment center; The Veterans Memorial Wall; high mast lighting for night time events and piped sound systems that will be linked throughout Water Street. The stage is set for this plaza to become THE core people-place for this proud and burgeoning community. The project has already been a major driving force in the redevelopment effort and, by doing so, provides the enhanced 21st Century identity to which the City aspire. |
| Extra Note: | “In the news :Briefs.” AIA LV Forum December 2006. AIA Nevada Design Awards (2006) Entry No. B06004, Submission. UNLV Architecture Studies Library holds: Form Core Boards, Project Identification Form, Photo Release Form, Intern Compensation Disclaimer Form, Project Entry Form, Exteriors Photos, Site Plan, Floor Plans, Interior Photos and CD |