Architecture Studies Library
       University of Nevada, Las Vegas Libraries
UNLV HOME (University of Nevada, Las Vegas)
Links for ASL and Libraries Hours for all UNLV Libraries Search catalog for all UNLV Libraries Access your library account ASL Comment Form
ASL Books     Articles     Course Reserves    
                            
The ASL The Web

UNLV Libraries Main Page -> Architecture Studies Library -> Las Vegas Guides and Collections -> Las Vegas Architects and Buildings Database -> Projects

Molasky Corporate Center

Photos & Links: (Web Page 1)
Location:
Las Vegas, NV
Type(s):
Subtype(s):
Constructed: 2006-12
Completed: 2008-07
Cost: $138.4 M
Size (sq. ft.): 852000
Other Size Measure: 2.9 Acres
17-Story, 243 Ft. Tower
6-Level, 568,000 Sq.Ft., 1,147 Space Parking Structure
Firm(s):
Architect(s):
Owners: Irwin Molasky (Developer)
Parkway Center LLC (Owner)
Contractors: Interior designer: Spazio Design, Inc.
Landscape architect: Nuvis Architect
Structural engineer: Englekirk Partners
Electrical engineer: Flack + Kurtz
Civil engineer: TRC/V-Point
General contractor: Korte Company
Description: Seeking LEED Gold Certification

The design is based on the unique site located right by US 95 and the interchange of I-15. To achieve the size of the development, the office building has to be on top of the parking garage. This arrangement creates several opportunities: to have a plaza level demonstration garden in the air where the building starts; to give the office tower a base to the ground; to increase the density of the development and creates an urban environment; and to elevate the building to have the maximum exposure on the freeway.

The geometry of the building is coming from the curving freeway in front of the building. The building has communications with moving cars with its size, materials, and forms. The garden level will be above the free way but building entrance will still be clearly identified because of the two-story high entrance statement.

The raised floor system is used in the buildings interior to distribute air power and data for efficiency and flexible distribution. Day lighting principals are incorporated into the design with different specification of the glass and light shelves. Solar panels are used to generate the energy for the garage, and innovative HVAC system is used for less energy consumption.
Award(s) Won:
Extra Note: AIA Nevada Design Awards (2006) Entry No. UB06004, Submission.
UNLV Architecture Studies Library holds: Form Core Boards, Project Identification Form, Photo Release Form, Intern Compensation Disclaimer Form, Project Entry Form, Exteriors Photos, Site Plan, Floor Plans, Interior Photos and CD

Goodman, Oscar. "Discover Las Vegas all Over Again!." Urban Land. September 2007: 58-60.

Illia, Tony 2006 Green Thumb. Southwest Contractor, October 58-60.

"Nevada Best of 2007: Molasky Corporate Cetner." Southwest Contractor. December 2007: 82.

Roberts, Alana. "Downtown Las Vegas's Urban Renewal: Revitalization of downtown and its arts and entertainment district bolsters its potential." Urban Land. September 2007: 108-113.

Smith, Hubble. “Progress continues at Molasky corporate center.” 2 October 2006. [Online].
http://www.reviewjournal.com/lvrj_home/2006/Oct-02-Mon-2006/business/9916580.html
Accessed October 2 2006.

"Southwest Contractor: 2006 Top Projects Nevada." Southwest Contractor. June 2007: 61.

"water authority's New "Green" Building" KTNV ABC , Channel 13,Las Vegas, Nevada. August 23,2007. LVO MG 4
Spatially Direct Parent: Union Park
Spatially Largest Parent: Union Park