| Location: |
3200 East Cheyenne Ave. North Las Vegas, NV 89030 |
|---|---|
| Type(s): | |
| Subtype(s): | |
| Purpose(s): | Addition |
| Constructed: | 2006-11 |
| Opened: | 2007 |
| Cost: | $17.5 M |
| Size (sq. ft.): | 34700 |
| Other Size Measure: | 10,490 Classroom and administrative wing |
| Firm(s): |
|
| Description: | Newest Building to CSN cheyenne campus, easily accessible for equipment, vehicel and sservice deliveries, without disturbing the main flow on campus. |
| Extra Note: | Mower, Lawrence. “New CCSN auto shop in the works.” 20 September 2006. [Online]. http://www.reviewjournal.com/lvrj_home/2006/Sep-20-Wed-2006/news/9753576.html Accessed September 20 2006. “Nevada News - August 2007.” Southwest Contractor. August 2007. 14-16. "Csn transportation building is the newest building planned as part of the cheyenne campus masterplan." AIA Las Vegas Forum- December 2007. December 2007. |