| Photos & Links: |
(Web Page 1)
|
|---|---|
| Location: |
4505 S. Maryland Pkwy Las Vegas, NV |
| Type(s): | |
| Subtype(s): | |
| Cost: | Phase I: $2.3 million Phase II: $5 million |
| Size (sq. ft.): | 43200 |
| Other Size Measure: | Phase I: 21,600sq.ft. Phase II: 21,600sq.ft. |
| Firm(s): |
|
| Contractors: | Phase I & II: Raphael Construction |
| URL (bibliographic): | http://www.unlv.edu/facilities/plancon/cdc.html |
| Description: | Phase I completed: Fall 2002 Phase II completed: Summer 2004 |
| Extra Note: | “Central Desert Complex (CDC)” UNLV Facilities Management and Planning. 2004. [Online]. Available: http://www.unlv.edu/facilities/plancon/cdc.html Accessed September 12, 2004. “New and notable.” Architecture Las Vegas 1, n.3 (2002): 15-21. AIA Nevada Design Awards (2002) Entry No. B01057, Submission. UNLV Architecture Studies Library holds: entry form/board, drawings, photos, cd Self-guided walking tour #6: UNLV. [online] Available http://www.library.unlv.edu/arch/lasvegas/unlv06.html Accessed:4/13/06. |