Architecture Studies Library
       University of Nevada, Las Vegas Libraries
UNLV HOME (University of Nevada, Las Vegas)
Links for ASL and Libraries Hours for all UNLV Libraries Search catalog for all UNLV Libraries Access your library account ASL Comment Form
ASL Books     Articles     Course Reserves    
                            
The ASL The Web

UNLV Libraries -> Architecture Studies Library -> Las Vegas Architects and Buildings Database

Las Vegas Architects and Buildings: firm
Las Vegas Architects and Buildings: people
Las Vegas Architects and Buildings: project
Las Vegas Architects and Buildings: Awards
Las Vegas Architects and Buildings: Project Types

Total 1 project(s)

Vocational -Technical Center of Southern Nevada (Phase 1 and 2)
Constructed 1966.
Completed 1968.
Phase 1 included the completion of the Student Center. This area included the library and its carrels, adjacent open spaces, classrooms around the upper floor and the faculty dining center. The upper balcony housed the culinary arts program.

Blurock, William. “Architectural Features of the Southern Nevada Vocational-Technical Center.” Report of National Vocational-Technical Facility Planning Conference (1967): 41-46.

Stimpson, Miriam F. A Field Guide to Landmarks of Modern Architecture in the United States.
Englewood Cliffs, N.J.: Prentice Hall, 1985. Arch Ref. NA 712 S75 1985 and LVA (F) GEN 7

Vocational - Technical Center of Southern Nevada (Phase 2): Las Vegas, NV.
Maple Rd. at Russell Rd.
James McDaniel, AIA
UNLV Special Collections holds: 104 drawings. September 1967. SPC(CN) 037

Other size measure:
160 acres. Initial space allowance 600,000 sq. ft. Phase 1 space allowance 200,000 sq. ft.

Location:
Las Vegas, NV
Intersection of Maple & Russell Rd.

Alternate name:
Southern Nevada Vocational Technical Center (SNVTC).


Architect:
McDaniel, James B. Primary role: Architect. Phase 2

Building type:
EDUCATIONAL
Vocational/Technical School





Updated: 08/23/2012.