Total 1 project(s)
Silverton Hotel-Casino New Hotel Tower
This hotel is the first in a series of master planned expansions to the Silverton Hotel campus and include an expanded casino, spa, pool and stage as well as a theater and convention facility. Balconies are incorporated into suite rooms from the 9th floor to the 17th floor and a large deck area completes the 20th level club space. A prominent north facade gradually racks back flanking rooms, resulting in a gold curtain wall element topped by an upturned roof plane featuring LED lighting effects sheltering the club deck below and supported by 5-story tubular steel columns.
Tower Also includes:
25,000 sq.ft. restaurant, lounge and gaming area
Spa
AIA Nevada Design Awards (2006) Entry No. UB06057, Submission.
UNLV Architecture Studies Library holds: Form Core Boards, Project Identification Form, Photo Release Form, Intern Compensation Disclaimer Form, Project Entry Form, Exteriors Photos, Site Plan, Floor Plans, Interior Photos and CD
Knightly, Arnold M. “Silverton eyes golden future: property on I-15 plans to launch 500 million expansion, upgrade.” Las Vegas Review Journal. 13 April 20007. [Online]. Avaiable: . Accessed April 13, 2007.
Cost:
$500 M Expansion and Upgrade (2007)
$15 M Spa
Alternate name:
Silverton Hotel-Casino 2006/2007 Additions.
Updated: 08/23/2012.